Heater Fabrication & Erection
- CLIENT SK GAS / JNK HEATERS
- SCOPE OF WORK FABRICATION & ERECTION OF REACTOR CHARGE HEATER
- WORK VOLUME STEEL : 350TON / COIL WELDING : 6,000 DI
- WORK PERIOD 2014. 06 ~ 2015. 02
RADIANT & CONVECTION MODULE TRANSPORTATION
RADIANT ERECTION
CONVECTION & STACK ERECTION
RADIANT COIL FABRICATION
RADIANT OUTLET MANIFOLD
CONVECTION COIL FABRICATION
TORE PROJECT (TURKMENBASHI, TURKMENISTAN)
- CLIENTHYUNDAI ENGINEERING / JNK HEATERS
- SCOPE OF WORKFABRICATION OF FIRED HEATERS
- WORK VOLUMESTEEL : 300TON / COIL WELDING : 5,000 DI
- WORK PERIOD2013. 08 ~ 2014. 02
RADIANT MODULING
RADIANT MODULING - CERAMIC & COIL WELDING
RADIANT COIL FABRICATION
CONVECTION MODULE HYDRO. TEST
NEEDLE COKE PROJECT (POSCO, KOREA)
- CLIENTPOSCO ENGINEERING / JNK HEATERS
- SCOPE OF WORKFABRICATION OF 3 FIRED HEATERS
- WORK VOLUMESTEEL : 250TON / COIL WELDING : 4,000 DI
- WORK PERIOD2013. 10 ~ 2014. 02
RADIANT MODULING
RADIANT COIL FABRICATION
STACK TRANSPORTATION
RADIANT MODULE TRANSPORTATION
HEATER FABRICATION & ERECTION
NEW PX PROJECT / SK INNOVATION, 2013¡¯
(8 Cylindrical Heaters with APH System)
H PROJECT / SK INNOVATION, 2013¡¯
(2 Cylindrical Heaters)
H PROJECT / SK INNOVATION, 2013¡¯
(4 Cylindrical Heaters)
STC A2 PROJECT / SAMSUNG TOTAL, 2013¡¯
(5 Cylindrical Heaters with APH System)
STC A2 PROJECT / SAMSUNG TOTAL, 2013¡¯
(5 Cylindrical Heaters with APH System)
STC A2 PROJECT / SAMSUNG TOTAL, 2013¡¯
(5 Cylindrical Heaters with APH System)
HEATER MODULING WORK
HEATER MODULING WORK
HEATER MODULING WORK
HEATER MODULING WORK
HEATER MODULING WORK
REVAMPING & MAINTENANCE
Heater Conv. Module ETS Replacement
Heater Conv. Module Coil Replacement
Radiant Coil Replacement
Burner Replacement
REFRACTORY LINING
REFRACTORY LINING
REFRACTORY LINING
REFRACTORY LINING
REFRACTORY LINING
DECOMPOSITION REFRACTORY
DECOMPOSITION FURNACE
REPRACTORY LINING / SK Energy
DECOMPOSITION FURNACE
REPRACTORY LINING / SK Energy
DECOMPOSITION FURNACE
REPRACTORY LINING / SK Energy
DECOMPOSITION FURNACE
REPRACTORY LINING / SK Energy
DECOMPOSITION FURNACE
REPRACTORY LINING / SK Energy
DECOMPOSITION FURNACE
REPRACTORY LINING / SK Energy
DECOMPOSITION FURNACE
REPRACTORY LINING / SK Energy
THERMAL REACTOR REFRACTORY WORK
THERMAL REACTOR
REPRACTORY LINING/S-OIL
THERMAL REACTOR
REFRACTORY WORK
THERMAL REACTOR
REFRACTORY WORK
THERMAL REACTOR
REFRACTORY WORK
Project Location |
Item No. |
Item Name |
Remark |
SK Energy |
SA-H5902 |
Decompostion Furnace |
New |
SK Energy |
SR-H4511 |
Thermal Reactor |
New |
SK Energy |
SR-H4611 |
Thermal Reactor |
New |
SK Energy |
SA-H3502R |
Thermal Reactor |
New |
SK Energy |
SB-H3502R |
Thermal Reactor |
New |
SK Energy |
SR-H6101 |
Thermal Reactor |
T/A work |
SK Energy |
SR-H6301 |
Thermal Reactor |
T/A work |
RAMMING WORK
HEXAGON MESH INSTALLATION
HEXAGON MESH INSTALLATION
HEXAGON MESH INSTALLATION
HEXAGON MESH INSTALLATION
PLASTIC CASTABLE RAMMING
PLASTIC CASTABLE RAMMING
PLASTIC CASTABLE RAMMING
PLASTIC CASTABLE RAMMING
REFRACTORY DRY-OUT
DRY OUT FOR THERMAL
REACTOR REFRACTORY LINING
DRY OUT FOR THERMAL
REACTOR REFRACTORY LINING
DRY OUT FOR THERMAL
REACTOR REFRACTORY LINING
DRY OUT FOR THERMAL
REACTOR REFRACTORY LINING
INCINERATOR REFRACTORY WORK

REFRACTORY WORK
BRIDGEWALL INSTALLATION
BOOTSEAL INSTALLATION
CASTABLE GUNNING WORK
CERAMIC FIBER BLANKET INSTALL
BURNER TILE INSTALLATION WORK
BURNER TILE INSTALLATION WORK
BURNER TILE INSTALLATION WORK
BURNER TILE INSTALLATION WORK
MAINTENANCE & REVAMP WORK
Scaffold Installation
New Heater Installation Revamping
Emergency Work
CCR Heater Tube Revamping
DETAIL CONSTRUCTION PROCEDURE
1. Chipping & Padding
2. Radiant Floor Installation
3. Radiant Side Wall Installation
4. Radiant Side Wall Bolting
5. Scaffolding in Radiant Inside
6. Safety Net Installation in Radiant Inside
7. Ceramic Blanket Lining
8. Radiant Coil Installation
9. Radiant Coil Installation
10. Radiant Roof erection
11. Convection Module erection
12. Stack 1st step erection
13. Stack Base Bolting
14. Stack 2nd step installation
15. Stack 2nd step Bolting
16. Cross Over Installation
17. Pneumatic Test
18. Burner Erection
STORAGE TANK : QAFCO-5 PROJECT PKG¡¯ 7
- Owner & ContractorAl-Rashid Trad. & Contr. Co. / Hamchang Contr. Est.
- Contract AmountUSD 10 Mil
- LocationJeddah, Saudi Arabia
- Construction PeriodMay 09 ~ Dec 10
- WORK VOLUMEPiping Work : 600 Ton / Steel Structure : 2,900 Ton / Equipment Erection : 3,400 Ton
WATER STPRAGE TANK : Briman Water Tank Project
- Owner & ContractorQAFCO / Hyundai Eng. & Const. Co.
- Contract AmountUSD 10 Mil
- LocationDoha, Qatar
- Construction PeriodJun 08 ~ Sep 09
- WORK VOLUME140,000 §© x 4 units / ID 98m x H 20.0m
Jeddah Briman
Jeddah Briman
Jeddah Briman
Jeddah Briman
Jeddah Briman
DETAIL CONSTRUCTION PROCEDURE (WATER TANK)
Internal Painting
Scaffolding
Cleaning
External Painting